Migrate from EasyDCIM to SynergyCP
One complete platform, one straightforward price — and an engineer-led migration, free with your paid license.
Why Switch from EasyDCIM?
EasyDCIM takes a modular approach: the core product plus separately licensed modules for the capabilities you need. That model works — until you notice how much of your feature set lives in add-ons, and how the cost of each new capability stacks on top of the last.
SynergyCP takes the opposite approach. The platform ships complete: bare metal provisioning, PXE OS reloads, IPMI and power management, switch automation, bandwidth billing, IP management, and a client portal are all part of the core product, priced simply per server. As your needs grow, your platform doesn’t get more expensive to assemble — it’s already all there.
What You Gain
- A complete platform — provisioning, power, networking, bandwidth, and client management in the core product, not spread across separately licensed modules.
- Simple pricing — transparent per-server pricing with month-to-month billing. Budgeting doesn’t require a spreadsheet of module licenses.
- Built by operators — SynergyCP’s roadmap is driven by hosting operators running 10,000+ servers in production — some spanning 20+ datacenter locations — so features arrive tested against real fleets.
- Deep WHMCS integration — automated ordering, provisioning, suspension, termination, and client SSO, refined over years of live deployments.
- On-premises control — SynergyCP runs in your datacenter, on your hardware, with your data under your control.
What We Migrate for You
Our engineers import your server inventory, locations and racks, IPMI access, switch and PDU configurations, IP allocations, and client accounts, then map your OS installation templates to SynergyCP equivalents. SynergyCP runs in parallel with EasyDCIM while you validate everything against live hardware — nothing changes for your customers until you sign off.
The Free Migration Process
- Assessment — we review your EasyDCIM deployment and give you a plan and timeline.
- Import — we bring your data into SynergyCP while EasyDCIM keeps running.
- Validation — you test OS reloads, power control, and WHMCS flows on real servers.
- Cutover — a scheduled maintenance window, our team on standby, zero downtime.
Most migrations complete within 48–72 hours of kickoff — included free with every paid SynergyCP license.