Migrate from NOC-PS to SynergyCP

NOC-PS served the industry well, but development stopped in 2022. We'll move you to an actively maintained platform — free with your paid license.

NOC-PS screenshot
NOC-PS
SynergyCP screenshot
SynergyCP

Why Switch from NOC-PS?

NOC-PS was a solid tool in its day, and plenty of providers built reliable operations on it. But its last update shipped in 2022. That means no security patches, no support for current server hardware or IPMI implementations, and no one to call when something breaks in the middle of the night.

SynergyCP ships updates frequently, tests against current hardware, and backs it all with a real support team. Everything NOC-PS does — PXE-based OS reloads, remote power management, WHMCS integration — SynergyCP does today, actively maintained, alongside a great deal NOC-PS never offered.

What You Gain

  • Active development — a steady stream of releases with new features, security patches, and support for the latest server vendors and switch models.
  • Features NOC-PS never had — real-time bandwidth graphing, automated suspension workflows, a client portal with IPMI/KVM access, IPv6 management, a full REST API, and webhooks.
  • Modern security — current authentication methods and regular patching, instead of software frozen in 2022.
  • A support team — responses in hours, SLA-backed assistance for critical issues, and a roadmap driven by providers running SynergyCP in production.
  • On-premises control — like NOC-PS, SynergyCP runs in your datacenter. You keep control of your data; you just stop being the only one maintaining the software around it.

What We Migrate for You

Our engineers import your server inventory, IPMI credentials, switch configurations, VLANs and IP space, and client records, then map your provisioning profiles to SynergyCP OS templates. SynergyCP runs in parallel with NOC-PS while you validate against live hardware — your current setup stays untouched until you’re satisfied.

The Free Migration Process

  1. Assessment — we review your NOC-PS deployment and give you a plan and timeline.
  2. Import — we bring your data into SynergyCP while NOC-PS keeps running.
  3. Validation — you test OS reloads, power control, and WHMCS flows on real servers.
  4. Cutover — a scheduled maintenance window, our team on standby, zero downtime.

Most migrations complete within 48–72 hours of kickoff — included free with every paid SynergyCP license.